Below is a Notice of Opportunity to Comment on the 2019-2020 draft determinations to approve mitigation measures for the Water Quality Control Policy on the Use of Coastal and Estuarine Waters for Power Plant Cooling (Once-Through Cooling or OTC Policy) for eight power plants: Alamitos Generating Station; Diablo Canyon Nuclear Power Plant, Harbor Generating Station, Haynes Generating Station, Huntington Beach Generating Station, Ormond Beach Generating Station, Redondo Beach Generating Station, and Scattergood Generating Station.
19-20 Draft Determinations for Public Comment
- 19-20 Draft Determination for Alamitos Generating Station
- 19-20 Draft Determination for Diablo Canyon Nuclear Power Plant
- 19-20 Draft Determination for Harbor Generating Station
- 19-20 Draft Determination for Haynes Generating Station
- 19-20 Draft Determination for Huntington Beach Generating Station
- 19-20 Draft Determination for Ormond Beach Generating Station
- 19-20 Draft Determination for Redondo Beach Generating Station
- 19-20 Draft Determination for Scattergood Generating Station